The documents we write
| Document | When you need it |
|---|---|
| Workplace risk assessment | Any place of work: an office, a shop, a workshop, a warehouse, a restaurant. |
| Contractor risk assessment | Before work on a construction project. Every contractor must have one in writing. |
| Safe Work Recommended Statement | For a job whose safe way of working has to be written down, step by step, before it starts. |
| Risk assessment and method statement (RAMS) | For a specific task with serious risk, such as lifting, demolition or work at height. |
| COSHH risk assessment | Where hazardous substances are used or stored. |
| Young persons risk assessment | Before you engage anyone under 18. |
| Maternity risk assessment | When a worker is pregnant, has recently given birth or is breastfeeding. |
| Public event risk assessment | Before a concert, a festa, a fair or a sports event. |
| Health and safety policy | To set out who is responsible for what in your organisation. |
| Emergency response plan | So that everyone knows what to do in a fire, an injury or an evacuation. |
How we prepare one
We look at the work
The premises or the site, the tasks, the equipment and the people who do the job.
We list what could cause harm
The hazards, who is exposed to each and how badly they could be hurt.
We set the controls
What is already in place, what is missing and who has to put it right.
You receive the document
Written for your work, ready to keep on file and to show to OHSA, a client or an insurer.
Keeping it current
A risk assessment describes the work on the day it was written. It should be reviewed when the work, the premises, the equipment or the people change, and after any accident or near miss. We review existing assessments as well as writing new ones.
What you receive
- A written risk assessment specific to your work
- Method statements for higher-risk tasks
- A list of actions with the person responsible for each
- A health and safety policy and emergency plan where you need them
Last reviewed:
